Thank You for Supporting Our Students and Schools

On behalf of the Catalina Foothills School District, we extend our heartfelt thanks to our community for your continued support of our bonds and overrides. Your trust and investment make an extraordinary difference in the lives of our students and staff.

CFSD is proud to be a district where every school is rated “A” by the Arizona Department of Education, where talented and dedicated educators inspire excellence, and where students thrive through a comprehensive curriculum, vibrant arts programs, and top-tier facilities.

As CFSD board member and former president Eileen Jackson so eloquently said, CFSD is unique in the commitment, confidence, and generosity we receive from our wider voting community. The buildings we teach in, the technology we use, and the programs we offer are all possible because of your belief in the power of public education—and in CFSD’s mission to provide the very best for every student.

Together, we have built more than just schools. We have built a community committed to educational excellence, to preparing students for college, careers, and life, and to shaping graduates who are ready to lead and serve in a complex world.

Thank you for partnering with us—and for believing in the future we are building, together.

With gratitude,
Catalina Foothills School District

 

 

 

Click on a site name to view the recommended priority projects funded by the 2022 bond issuance.
Each site was assessed to identify the highest-priority needs from the original list of bond projects, ensuring the most impactful improvements are completed with Project 2022 funds.


 

    • Replace acoustical tiles in classrooms
    • Install a classroom ramp to the outside in the 4th-grade pod (ADA)
    • Install sidewalk to playground ramada (ADA)
    • Repaint canopies, fences, and gates throughout the campus
    • Add 2-3 new classrooms, including furnishings, fixtures & equipment
    • Kitchen Renovation to enlarge the kitchen and store serving lines
    • Resurface the basketball court
    • Repair, reseal, and restripe the front parking lot
    • Kitchen expansion/renovation to increase kitchen and store serving lines
    • Repair, reseal, and restripe the guest parking lot
    • Install a large shade structure by the flagpole
    • Remove the roll-up garage doors in classrooms 114,115,117,118,119, and fill in the openings
    • Replace and install exterior signage
    • Repair, reseal, and restripe the front parking lot
    • Replace roofs in rooms 3-8
    • Replace the irrigation system in front of the school
    • Remove and replace the west staff parking lot
    • Replace tennis courts with post-tension
    • Mill and repave the main parking lot
    • Replace PE/MPR doors
    • Install and/or replace campus signage
    • Install and/or replace exterior signage
    • Renovate and/or modify rooms 202, 303, 502, and 606 to accommodate instructional needs.
    • Repurpose PE locker rooms for health classrooms
    • Replace urinal partitions in boys’ restrooms
    • Replace drought-stressed landscaping
    • Renovate an existing classroom to accommodate a steel drum classroom space
    • Add parking at Valley View
    • Replace all interior blinds
    • Install a new stadium field sound system
    • Reseal the junior parking lot
    • Retrofit science classrooms in house 4
       


      A young woman plays the violin during an orchestra rehearsal.    A young boy plays a guitar in a classroom setting, with other students and a teacher in the background.    A young man plays the cello during a music rehearsal.    A group of young people play acoustic guitars during a music lesson.
    • Replace 13 Vision Buses
    • Replace special education Micro Bird buses
    • Construct a new maintenance bay and additional restrooms

     

    A yellow school bus with the words 'School Bus' and 'Stop' signs visible.

Completed 2022 Bond Projects

 

A young boy plays a guitar in a classroom setting, with other students and a teacher in the background.

 

A yellow school bus with the words 'SCHOOL BUS' displayed on the front, parked in a desert environment.

 

Districtwide

  • Adopted the Centegix safety alert system

  • Completed security improvements across all campuses

Catalina Foothills High School 

  • Constructed the Strings/Guitar addition to the Music Hall

  • Replaced the running track and track shed

  • Purchased two new 14-passenger white minibuses (student transportation)

  • Purchased two new Toyota Siennas (student transportation)

Sunrise Drive Elementary School

  • Replaced roof hip shingles

Ventana Vista Elementary School

  • Replaced the south play structure near the Central Plant with a new large structure and shade sail

  • Added ADA access ramp to the southwest play structure

  • Replaced outdated irrigation systems

Maintenance and Transportation Center (MAC)

  • Installed lighting for the bus yard

  • Replaced 2 Microbird special education buses

  • Replaced 9 Vision buses

  • Replaced 6 Transit buses

  • Replaced 1 Special Education Transit bus

A color palette featuring shades of purple, green, brown, and yellow.

Join our mailing list and learn how CFSD is making a difference in our community.

 

Subscribe

 

 

 

Download our fast facts sheet and see why CFSD is Arizona’s top school district.

 

Download